Planning application submitted for wind turbines at Llwyncelyn Farm

Cenin Renewables have submitted a planning application for two 2.5MW wind turbines to be installed at Llwyncelyn Farm, near Porth. Generating local income from the wind turbines means we can support the local community. We are hoping, if our planning application...

Continue reading →

Cenin Renewables awarded planning permission for two solar farms

We have recently been awarded planning permission for two large solar projects on farm land in the Vale of Glamorgan. The land is currently used to graze sheep, so our scheme has been designed to have panels which are high...

Continue reading →

Sustain Wales Summit a great success.

The Sustain Wales Summit at the Principality Stadium in Cardiff, for which Cenin Group were the main sponsors, was a great success. As well as highly informed presentations by experts on renewable energy, sustainable economy and policy change, we also heard from those...

Continue reading →

A Tiny House in Construction

From January to October 2016, Cenin provided free workshop space to a local individual building an innovative eco-microhome which utilized the builder's previous knowledge of renewable energy and sustainable buildings. An independent trailer manufacturer in St. Clears produced a bespoke 14 x 8ft...

Continue reading →

Cenin Group tackles climate change

Cenin Group was established to develop innovative technologies. Our technology developed at Cardiff University, uses advanced analytical techniques and chemical engineering to allow the production of ultra-low carbon cements. A founding principal of Cenin Group came from a study tour...

Continue reading →

Sustain Wales Summit

21 April 2016, 10am-3pm Principality Stadium, Cardiff What innovation do we need for a Sustainable Economy? The summit will bring together sector-leading experts who are translating the principles of sustainability into practice and will address cutting edge themes such as low-carbon technology,...

Continue reading →

Our first wind turbine

Our first wind turbine, T1, was installed in November 2015. It is a 1.5MW Vensys 77 which can operate in wind speeds between 3m/s and 22m/s. The turbine was chosen for its innovative and efficient direct drive design. The...

Continue reading →