Installing a new wind turbine!
This March, Cenin Renewables were delighted to install our second wind turbine at Parc Stormy, a Vestas 117 (with a 117m rotor diameter) which generates 3.6MW of power. After a short delay caused by the high winds, a weather window opened between Storm Dennis and Storm Jorge. The installation went smoothly thanks to the excellent work by the Vestas team and our site managers Knights Brown.
(cover photo: Brian Batters, Porthcawl)